{"id":2876,"date":"2025-08-11T16:05:50","date_gmt":"2025-08-11T14:05:50","guid":{"rendered":"https:\/\/www.gruene-mkk.de\/?p=2876"},"modified":"2025-08-11T16:05:50","modified_gmt":"2025-08-11T14:05:50","slug":"rueckenwind-fuer-den-radverkehr-im-westlichen-main-kinzig-kreis","status":"publish","type":"post","link":"https:\/\/www.gruene-mkk.de\/tr\/rueckenwind-fuer-den-radverkehr-im-westlichen-main-kinzig-kreis\/","title":{"rendered":"Bat\u0131 Main-Kinzig-Kreis'te RADYAL TA\u015eIMACILIK \u0130\u00c7\u0130N ARKA R\u00dcZGAR"},"content":{"rendered":"<p><strong>Hanau, Maintal ve Frankfurt aras\u0131ndaki h\u0131zl\u0131 d\u00f6ng\u00fc yolunun ger\u00e7ekle\u015ftirilmesi yakla\u015f\u0131yor<\/strong><\/p>\n\n\n\n<p>\u0130ttifak 90 \/ Ye\u015filler Hanau ve Main-Kinzig, FRM7 d\u00f6ng\u00fc rotas\u0131n\u0131n somut planlamas\u0131 i\u00e7in Hessen eyaletinin deste\u011fini memnuniyetle kar\u015f\u0131l\u0131yor. Destekle birlikte, Hanau'daki bisiklet altyap\u0131s\u0131n\u0131n Maintal ve Frankfurt'a do\u011fru geni\u015flemesi s\u00fcrekli olarak ilerliyor.<br>Kesselstadt b\u00f6lgesindeki yeni b\u00f6l\u00fcm, ta\u015f\u0131tlar\u0131n i\u015fyerine s\u00fcrd\u00fcr\u00fclebilir ve sa\u011fl\u0131\u011f\u0131 te\u015fvik edici bir \u015fekilde seyahat etmelerini kolayla\u015ft\u0131racak verimli ve g\u00fcnl\u00fck bisiklet ba\u011flant\u0131s\u0131na do\u011fru \u00f6nemli bir ad\u0131md\u0131r.<\/p>\n\n\n\n<p>Arka plan i\u00e7in:<\/p>\n\n\n\n<p>Bu hafta bilindi\u011fi gibi, Hessen eyaleti, FRM7 Hanau-Maintal-Frankfurt y\u00fcksek h\u0131zl\u0131 bisiklet rotas\u0131n\u0131n bir b\u00f6l\u00fcm\u00fcn\u00fcn planlanmas\u0131nda 730.400 avro ile Frankfurt RheinMain B\u00f6lge Birli\u011fi'ni destekliyor. Bu, Wiesbaden'deki Ekonomik \u0130\u015fler ve Ula\u015ft\u0131rma Bakan\u0131 Kaweh Mansoori taraf\u0131ndan a\u00e7\u0131kland\u0131. Proje i\u00e7in toplam harcama yakla\u015f\u0131k 913.000 Euro tutar\u0131ndad\u0131r.<\/p>\n\n\n\n<p>Hanau'nun Kesselstadt il\u00e7esinde iki kilometrelik bir b\u00f6l\u00fcm\u00fcn planlanmas\u0131 desteklenmektedir. Yeni ba\u011flant\u0131, Frankfurter Landstra\u00dfe\/Kastanienallee kav\u015fa\u011f\u0131ndan do\u011fu y\u00f6n\u00fcnde Katharina-Belgica-Stra\u00dfe'ye kadar uzanacak. Bu s\u00fcre\u00e7te Kinzig \u00fczerinde yeni bir ayak ve bisiklet yolu k\u00f6pr\u00fcs\u00fc de in\u015fa ediliyor.<\/p>\n\n\n\n<p>Gelecekte, FRM7 h\u0131zl\u0131 bisiklet ba\u011flant\u0131s\u0131, kuzey-anakara taraf\u0131ndaki Frankfurt am Main, Maintal ve Hanau \u015fehirlerini yakla\u015f\u0131k 17 kilometre boyunca birbirine ba\u011flayacak. \u015eu anda yol boyunca yakla\u015f\u0131k 110.000 ki\u015fi ya\u015f\u0131yor. B\u00f6lgede yakla\u015f\u0131k 9.600 \u00f6\u011frenci okula gidiyor. Gelecekteki h\u0131zl\u0131 bisiklet ba\u011flant\u0131s\u0131n\u0131n yakla\u015f\u0131k 800 ila 1.300 bisiklet b\u00f6l\u00fcm\u00fc zaten her g\u00fcn kullan\u0131yor. FRM7, g\u00fcnde 2.000'den fazla bisiklet\u00e7i potansiyeline sahiptir.<\/p>\n\n\n\n<p>Hibe, yerel hareketlili\u011fin te\u015fviki i\u00e7in Hessen Eyaletinin y\u00f6nergelerine uygun olarak verilir. Buna g\u00f6re, y\u00fcr\u00fcy\u00fc\u015f ve bisikleti g\u00fc\u00e7lendirmek i\u00e7in yat\u0131r\u0131m \u00f6nlemlerine ek olarak, uygun planlama, kavramlar ve halkla ili\u015fkiler \u00f6nlemleri de s\u00fcbvansiyon alabilir. Planlama en k\u0131sa s\u00fcrede ba\u015flamal\u0131 ve Haziran 2026'n\u0131n sonuna kadar tamamlanmal\u0131d\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Hanau ve Main-Kinzig Ye\u015filleri, FRM7 bisiklet rotas\u0131n\u0131n somut planlamas\u0131 i\u00e7in Hessen eyaletinin deste\u011fini memnuniyetle kar\u015f\u0131lamaktad\u0131r. [...][d\u00fczenle]<\/p>","protected":false},"author":-1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2876","post","type-post","status-publish","format-standard","hentry","category-allgemein"],"_links":{"self":[{"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/posts\/2876","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/comments?post=2876"}],"version-history":[{"count":1,"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/posts\/2876\/revisions"}],"predecessor-version":[{"id":2877,"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/posts\/2876\/revisions\/2877"}],"wp:attachment":[{"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/media?parent=2876"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/categories?post=2876"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gruene-mkk.de\/tr\/wp-json\/wp\/v2\/tags?post=2876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}