{"id":484,"date":"2021-06-11T13:33:00","date_gmt":"2021-06-11T11:33:00","guid":{"rendered":"https:\/\/www.alles-bleibt-anders.org\/?p=484"},"modified":"2024-09-05T14:42:06","modified_gmt":"2024-09-05T12:42:06","slug":"anfrage-zur-akademie-fuer-gesundheit-und-pflege","status":"publish","type":"post","link":"https:\/\/www.gruene-mkk.de\/en\/anfrage-zur-akademie-fuer-gesundheit-und-pflege\/","title":{"rendered":"Inquiry to the Academy of Health and Care"},"content":{"rendered":"<p><strong>Subject of the question:<\/strong><\/p>\n\n\n\n<p>On 25 September 2020, the district council decided that a separate location should be built for the Academy for Health and Care in Gelnhausen in the educational building of the education partners Main-Kinzig.<\/p>\n\n\n\n<p><strong>Questions:<\/strong><\/p>\n\n\n\n<p>1. What steps have been taken since the decision of the district council?<\/p>\n\n\n\n<p>Since the district council decision on the Gelnhausen site, a first draft for an extension at the Bildungshaus has been drawn up. The necessary spatial planning is currently being finalized. At the same time, a joint IT solution is being worked on, which is necessary for the operation of the Main-Kinzig-Akademie. For the implementation of the new joint training, a joint curriculum has been drawn up under scientific supervision since last year. Despite the complexity of the practical training, a large training network with many partners could already be realized last year.<\/p>\n\n\n\n<p><br>2. When is the Academy of Health and Care expected to be completed?<\/p>\n\n\n\n<p>Due to the open financing question and the legal framework, a completion date is currently not to be determined definitively.<\/p>\n\n\n\n<p><br>3. What was the total cost originally estimated for this purpose?<\/p>\n\n\n\n<p>The cost estimate by the architectural firm Rack\/ Gelnhausen for the design serves as a reference for the cost expenditure. The costs currently amount to approximately \u20ac16.5 million without land.<\/p>\n\n\n\n<p>a. Is it to be expected that the total costs will be higher than the estimated amount?<\/p>\n\n\n\n<p>i. If so, what additional costs does the administration expect?<\/p>\n\n\n\n<p>When construction starts in 2023, an estimated price increase of 3-6% EUR 17.5 to 18.5 million per annum.<\/p>\n\n\n\n<p><br>ii. If so, why do these additional costs arise?<\/p>\n\n\n\n<p>Due to the current volatile conditions (e.g. scarcity of raw materials) in the construction industry, this estimate can only be made roughly.<\/p>\n\n\n\n<p><br>4. Is the position of director already filled?<\/p>\n\n\n\n<p>The line was re-occupied from 01.04.2021. The jobholder Reinhard Baum has been working as a manager in vocational nursing education for several decades. As a dipl. Company educator and cand. MA in Leadership and Coaching, he is well equipped for this position.<\/p>","protected":false},"excerpt":{"rendered":"<p>Subject of the question: On 25 September 2020, the district council decided that the Academy for Health and Care will build its own location in Gelnhausen in the educational building of the education partners Main-Kinzig.<\/p>","protected":false},"author":-1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-484","post","type-post","status-publish","format-standard","hentry","category-antraege-und-anfragen"],"_links":{"self":[{"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/posts\/484","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/comments?post=484"}],"version-history":[{"count":1,"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/posts\/484\/revisions"}],"predecessor-version":[{"id":485,"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/posts\/484\/revisions\/485"}],"wp:attachment":[{"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/media?parent=484"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/categories?post=484"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gruene-mkk.de\/en\/wp-json\/wp\/v2\/tags?post=484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}